Montenegro: Tunnel Sozina Reconstructed
Works on the reconstruction of railway in tunnel Sozina, on Belgrade-Bar railway, 6,712 meters of length, are finished.
The works included replacement of existing wooden sleepers with concrete, replacement of rails, overhead lines and signalization and cleaning of existing drainage channels.
Works were performed by Strabag AG Austria company, under the supervisions of Institute for Construction from Podgorica. Contracted value was 4,190,245 EUR.
Project is realized as a part of Operational Programme Regional Projekat 2012-2012, adopted by the Government of Montenegro and European Comission in 2013, and financed from Instrument of Pre-Accession Assistance through component III – Regional Development.